Processing Options and Scheduled UBE\'s
Does anyone have experience or is familiar with a method of passing processing options in a UBE for a scheduled job?
For example...if invoicing (R42565) is a scheduled job (AS/400 Scheduler - not P91300) and the job is submitted at 9:00 p.m., with P.O. # 1 on the print tab set to blank, the "system date" will be used to print the invoice.
If the R42565 is run at 1:00 a.m., the same holds true, however the only way to change the invoice date to the previous day is by manually changing P.O. # 1 on the print tab from blank to the required invoice date.
Is there a way of running a UBE (ie. R42565) as a scheduled job and pass a processing option without manual intervention?
Does anyone have experience or is familiar with a method of passing processing options in a UBE for a scheduled job?
For example...if invoicing (R42565) is a scheduled job (AS/400 Scheduler - not P91300) and the job is submitted at 9:00 p.m., with P.O. # 1 on the print tab set to blank, the "system date" will be used to print the invoice.
If the R42565 is run at 1:00 a.m., the same holds true, however the only way to change the invoice date to the previous day is by manually changing P.O. # 1 on the print tab from blank to the required invoice date.