sashton
Reputable Poster
I am attempting to upgrade from 8.12 to 9.0 and instead of upgrading the deployment server, I am wanting to swap it out with a newer updated box. The sequence I have gone through to this point is: Installed the Deployment Server install on the new box, took all environments. Applied 8.98.3.2 tools release and then the latest 9.0 planner ESU. At this point, I am now logging into my new deployment server and not sure what to do. Do I create a typical install plan as a I would normally do on a new install and add my old deployment server as an "additional" deployment server? I can't run an upgrade plan on the new box because it doesn't even know about my existing 8.12 instance yet. Thanks in advance for your recommendations.