Dear all:

We have such situation:after the R31802A running,the material cost(A1) should be booked to the work center of F3112 or F3102.It means the work center of the material consumed is the MBU in the related account .I tried the following two ways:

1) Flex account
--setup the acct chart on the work center
--Add F3102 to the R31802A in Enabled Funtionality by Application
--Flexible AAI 3120 with P40296 and left the MBU blank in AAI table.
--Enable the flex account of the R31802A and run .

2) Cost by Work center
--activate the cost by work center in Manufacturing constant
--Run R31802A ,process option --- Journal entries by Work Center =1

Both of the method failed.The MCU of the generated account is always equal to MCU in the work order header .

We are using 8.12 and I search a lot but can't find a solution .We do not want to customize .

Any suggestion is greatly appreciate .Thanks
 
This issue has settled.

Setup some locations same as the work center name.The planner edit the 'Work Center' location of part lists after work order generated.Use the flexible account for F3111 ,field LOCN for AAI 3120.The result is ok.
 