Mult-level cost report

JDEUSER27

Member
Have a question on program R30445 (Multi-Level Costed Bill Report). There is a column labeled "Extras A-D", what displays in this field? I would assume that cost types other that "A1" would show up in this field. In my case I have a component with a outside operation cost type D1 but the system does not show the cost amount in the field.
 
Take a look at P30206, Where does you D1 cost show up there? This is controlled by the 30/CB UDC , description 1 is the actual label, description 2 is the "bucket" for your costs to appear at.
 
Back
Top