CHo
VIP Member
Hi. I have some questions about OMW and batch versions. Please bear with me because I'm just starting to learn it.
Two situations:
1. A user will be add and deleting batch versions. Since all batch versions will be added to default project. Do I need to set up OMW to make sure that the user's default project is at status 40 (Production development)?
I noticed that if it's at status 21, then the user can't delete it from PD because it thinks that the central objects are in DEV.
2. Because of the nature of my job, I can be in either PY or PD. What status should I set my default project to in order for me to delete batch versions? If I change the originator status to 40 (see above question) is there a way that I can bypass that? (ie My default project won't be at status 40).
Thanks for your help.
C Ho
Intermediate Programmer/Analyst
B7322 SP 12.4
AS/400 coexistant with SQL Server 7.0
Sandbox: Xe AS/400 coexistant with CO on SQL 7.0
Two situations:
1. A user will be add and deleting batch versions. Since all batch versions will be added to default project. Do I need to set up OMW to make sure that the user's default project is at status 40 (Production development)?
I noticed that if it's at status 21, then the user can't delete it from PD because it thinks that the central objects are in DEV.
2. Because of the nature of my job, I can be in either PY or PD. What status should I set my default project to in order for me to delete batch versions? If I change the originator status to 40 (see above question) is there a way that I can bypass that? (ie My default project won't be at status 40).
Thanks for your help.
C Ho
Intermediate Programmer/Analyst
B7322 SP 12.4
AS/400 coexistant with SQL Server 7.0
Sandbox: Xe AS/400 coexistant with CO on SQL 7.0