Re: RE: JDE Scheduler - AS/400 out of sync
Thx Darrell, I think you definitely put me on the right path. Our P91300 ( JDE Scheduler App) processing option under the Display tab is as follows
Local time =2
Local Time Zone = 23
Never adjust to DST = "0"
Day light saving rules when adjusting DST = USA
On the iSeries 400 the QHOUR is correct and the QUTCOFFSET = -4:00 ( use to be –5:00) Theoretically this should work.
What I did notice when fooling around with the P91300 and changed the processing option from “0” ( Never adjust DST) to 1 ( adjust DST ), added new job to the scheduler to test. It worked fine with the correct time. Which is all very good BUT what I also found was that all existing jobs in the JDE scheduler moved all existing jobs up an hour. E.g. job scheduled to run @9:00 now moved to 10:00.
If I left the switch at”1” would mean that I’d have to go to each Sched job and set it back 1 hours. With the switch set to “0” the job reflects the right time for which it’s going to launch but only launches 1hour after the scheduled time ( All too crazy).
Question now becomes, if I set the process option switch to “1” ( adjust DST) set each job in the scheduler back an hour would I have to do adjust the time again for each job in the fall ???? This is also the conflict I think you were trying to explain to me. Other question is - Do I have to IPL the AS/400 for the UTC change to take place?