vivek_kaushal
Well Known Member
Hi JDEList
During the testing, we submitted a lot of jobs using scheduler(in thousands). Now I want to delete all the jobs. So I ran the job R91300b to perge the jobs. It perged the jobs from scheduler that are either completed or launched.
But Now I see a lot of jobs in the Job Master(P986110B) with status=waiting and as soon as I start the JDE services on the Enterprise server, these jobs are getting fired.
Is there a way that I can get rid of these jobs?
Thanks
Vivek Mohan
XE update 3, Service Pack 18.1_B1
Windows NT Enterprise Server
During the testing, we submitted a lot of jobs using scheduler(in thousands). Now I want to delete all the jobs. So I ran the job R91300b to perge the jobs. It perged the jobs from scheduler that are either completed or launched.
But Now I see a lot of jobs in the Job Master(P986110B) with status=waiting and as soon as I start the JDE services on the Enterprise server, these jobs are getting fired.
Is there a way that I can get rid of these jobs?
Thanks
Vivek Mohan
XE update 3, Service Pack 18.1_B1
Windows NT Enterprise Server