Moamen
Member
Error in install new BATCH server.
Hi,
We have JDE 811 SP1, TR 8.98 with database oracle 11g.
We have install a new BATCH server to our environment.
I create the plan from PSFTPLAN En. and its validated.
But, In Installation Workbench, when i push configure, the En DEP811 validated good and PD811 give error.
I attached jde.log for details.
Kindly, I need response as soon as possible.
Regards,
Moamen
Hi,
We have JDE 811 SP1, TR 8.98 with database oracle 11g.
We have install a new BATCH server to our environment.
I create the plan from PSFTPLAN En. and its validated.
But, In Installation Workbench, when i push configure, the En DEP811 validated good and PD811 give error.
I attached jde.log for details.
Kindly, I need response as soon as possible.
Regards,
Moamen