alebbar
Member
hi liste,
Well, i have to do my first upgrade, and i would like to have some hints and
tips to do my upgrade as good as possible.
if someone can write me, that would be nice.
My configuration :
- Enterprise Server : HP9000 (HPUX)
Oracle 8.0.5
36 Gb free
- Deployment Server : HPLC3 (NT Server)
20 Gb free
- OneWorld : B733.1 SP13.1
- Objects : New Developped UBEs (system 55 to 59)
New Tables & BSVW (system 55 to 59)
Actually, i would like to discuss the steps of the upgrade :
prerequisites
installing OneWorld on Depserver
creating the upgrade plan...
...
until Merging the developped objects to OneWorld Xe
Thanks a lot
Aziz
Aziz Lebbar
J.D.Edwards Technical Consultant
CAP'INFO
Morocco
Well, i have to do my first upgrade, and i would like to have some hints and
tips to do my upgrade as good as possible.
if someone can write me, that would be nice.
My configuration :
- Enterprise Server : HP9000 (HPUX)
Oracle 8.0.5
36 Gb free
- Deployment Server : HPLC3 (NT Server)
20 Gb free
- OneWorld : B733.1 SP13.1
- Objects : New Developped UBEs (system 55 to 59)
New Tables & BSVW (system 55 to 59)
Actually, i would like to discuss the steps of the upgrade :
prerequisites
installing OneWorld on Depserver
creating the upgrade plan...
...
until Merging the developped objects to OneWorld Xe
Thanks a lot
Aziz
Aziz Lebbar
J.D.Edwards Technical Consultant
CAP'INFO
Morocco