Scheduler Problem after end of daylight saving

aussieabroad

Member
Hi, After the end of daylight saving in Europe on Sunday, our 8.10 job scheduler is now launching jobs 1 hour earlier than the time that is actually shown in the job scheduler itself. So a job scheduled for 8am is launching at 7am. Any ideas on what we can check, AS400 system time is fine.
Thanx
 
Have you checked the processing options on P91300 to enable/disable daylight savings time and check the P00085 app to be sure your daylight rules are set appropriately?
 
Back
Top