• Introducing Dark Mode! Switch by clicking on the lightbulb icon next to Search or by clicking on Default style at the bottom left of the page!

PO receiving

pclara74

Active Member
Hi All,
I am doing a process testing to implement with RMA Process in E1 8.11.
If I have to cancel a Line during the receiving the system automatically updating cancel date and GL date as requested date which will be future date.
But If i received the system updating receipt date and GL date as today's date correctly.

How can I get the cancel date and GL as todays date for cancel lines?

Thanks in advance

Clarence
 
Top