Multiple Plant Demands

jmcbride

Member
Issue:

Currently have one manufacturing plant that supplies to multiple
demand plants.
Cannot programmatically determine link between OT messages and WO
messages
because of Item Master settings.

Has anyone had the same issue with trying to determine the originating
plant demands
to tie the WO back to the OT messages?

Have search JDE knowledge garden.

Thanks.

World 8.1 base.
 
Set the Document type in the MRP program to be different for each demand
plant
 
Back
Top