Interactive Job Last Execution Date

Jeff_MontAssoc

Active Member
I've been tasked with determining the last execution date for some batch and some interactive jobs. When looking at the F983051 I can see the last execution date (alias VED) for batch jobs, but the field is blank for all interactive jobs.

How can I determine the last time interactive jobs were executed?

E1 9.1
 

Frosty the Coder

Legendary Poster
Regrets, but JDE doesn't track when an APPL was last executed.
It's been discussed here before, and I don't recall anyone coming up w/a solution to this.
 

jejims

Active Member
You have got to enable history tracking for data item alias VED. =0A=0ASent from Yahoo Mail on Android=0A=0A
 
Top