Get operation on Interactive Version

AVANKAD

Member
Hi ,
I have did a GET operation on an interactive version P42025|EC0001 (for the PD version) on the local fat client. Can some one let me know the GET operation overrides the processing options from PD to DV environment ? Is there a way can we undo these changes ?

THanks,
Prathima
 
Do a GET from DV environment again and it will override the local spec from DV provided you checkin before doing GET from PD else it will be lost unless if you have it in SAVE location.

Chan
 
HI Chan,
Thanks for that. But i think am not clear what i wanted to know is can we override the changes Get operation made on PD from DV. Can you please give me in steps ? Sorry to bother you as am bit novice to this.
Thanks,
P
 
Back
Top Bottom