Hi List,

Our production process is such that we manufacture large production runs of
any given product. Invariably, the production run will need to completed
into multiple stockyard locations. We are currently using the 'Co/By
Completion Revision' form (W3115F) to do this. However, when you complete
into multiple locations, the 'Quantity Ordered' does not get split between
the two locations, (as shown below).



When you enquire on the Supply / Demand screen (P4021),

this gives the impression that there is still planned production coming
through the system when in reality there is not;





I did find a Sar that seemed to be the solution for this but i did not make
a note of it and now try as i might i cannnot find it.



Does anyone know what this Sar is OR have a solution of their own



Many thanks

Paul Watton,

Senior Developer,

Finance Team,

Ibstock Brick Ltd

Jde XE update 6 , Service Pack 22 , Oracle 8.1.7.4 Sun Solaris



















This is the JDELIST EnterpriseOne Developers Mailing List.
The instructions on how to unsubscribe from any JDELIST mailing list are
available here <http://www.jdelist.com/unsubscr.shtml> .
JDELIST is not affiliated with JDEdwards=AE.
 
Back
Top