Actual Costing 02 and 09

hsiao_te_wang

Well Known Member
Hi Lists,

Like to clarify what's the difference by giving item cost level (CLEV) = 3, the functions/results between cost methods 02 and 09 ? Or can we say 02 is suggested CLEV = 2 and 09 is suggested when CLEV = 3 under manufacturing actual costing ?
Thanks any feedbacks !

Regards,
John
E1 9.0 Tools 9.1.0.4
 
Back
Top