Hello,
I know that SAP have possibility to set goods receipt days, is there a same option for E1(9.0)?
It would be needed to specify incoming inspection duration and therefore should help to measure real lead time for the supply schedule.
or any alternatives?
I know that SAP have possibility to set goods receipt days, is there a same option for E1(9.0)?
It would be needed to specify incoming inspection duration and therefore should help to measure real lead time for the supply schedule.