Levis
Member
exists job. it job running TC R55SAMPLE on enterprise server.
TC code Event Row Fetched
X0010 - Get Next Number (-->01,-->1, NewAN8<--)
F0101Z2.Insert
CALL(R01010Z, ver) (there not checked checkbox Asynhronously)
F0101.Fetch Single(AN8 = NewAN8)
If File_IO_Status = SUCCESS
THEN OK
and 2 variant
F0101Z2.Insert
CALL(R01010Z, ver) (there not checked checkbox Asynhronously)
F0101Z2.FetchSingle(EDSP)
IF EDSP = Y THEN OK
it's right!?
The TC will be wait while UBE R01010Z finished work and after go to line F0101Z2.Fetch
TC work output table F55SAMPLE is a not F0101Z2
How it do if
UBE running via Interactive Application(IE 7.0) on EnterPrise Server
thank you
TC code Event Row Fetched
X0010 - Get Next Number (-->01,-->1, NewAN8<--)
F0101Z2.Insert
CALL(R01010Z, ver) (there not checked checkbox Asynhronously)
F0101.Fetch Single(AN8 = NewAN8)
If File_IO_Status = SUCCESS
THEN OK
and 2 variant
F0101Z2.Insert
CALL(R01010Z, ver) (there not checked checkbox Asynhronously)
F0101Z2.FetchSingle(EDSP)
IF EDSP = Y THEN OK
it's right!?
The TC will be wait while UBE R01010Z finished work and after go to line F0101Z2.Fetch
TC work output table F55SAMPLE is a not F0101Z2
How it do if
UBE running via Interactive Application(IE 7.0) on EnterPrise Server
thank you