jimmymac
Reputable Poster
We are on E1 9.0, tools 8.98.42.
We have a request to schedule a certain job to run every 30 minutes but only between 6 am and midnight. To set up this up in Job Scheduler, we would seem to have two options. Set it up to run daily evey thirty minutes, 24 hours, which is actually more often than needed since we really don't need or want it to run between midnight and 6 am. Or set up 37 individual job scheduler entries. One at 6:00 am, one at 6:30 am, etc up till midnight.
Has anyone had a similar request and come up with a better solution? Thanks for your response.
We have a request to schedule a certain job to run every 30 minutes but only between 6 am and midnight. To set up this up in Job Scheduler, we would seem to have two options. Set it up to run daily evey thirty minutes, 24 hours, which is actually more often than needed since we really don't need or want it to run between midnight and 6 am. Or set up 37 individual job scheduler entries. One at 6:00 am, one at 6:30 am, etc up till midnight.
Has anyone had a similar request and come up with a better solution? Thanks for your response.