Jeff_MontAssoc
Active Member
I've been tasked with determining the last execution date for some batch and some interactive jobs. When looking at the F983051 I can see the last execution date (alias VED) for batch jobs, but the field is blank for all interactive jobs.
How can I determine the last time interactive jobs were executed?
E1 9.1
How can I determine the last time interactive jobs were executed?
E1 9.1