Engineering change order error

schatzie

Active Member
One of my users uses the P48020 to enter an ECO number
He than uses P3013 to enter all of the parts. Once in a while it seems to become corrupt.
The following error appears:
Record invalid ( help description is as follows - the record being process already exsists for an add function or does not exists for an 'inquiry' change or delete'
resolution: if you are attempting to inquire, change or delete a record you previously added, there may be data base errors in your production library

The second was is error code 9999 doew not exist.

I do not think the second error really means any thing. I am thinking that if I resolve the first error, the second one will take care of itself.

Does any one have any ideas? The engineering department gets frustrated that they have to re-enter hundreds of line items into a new ECO number

Thanks all
(anyone who has a holiday on Monday - enjoy)
 
Schatzie,

In the ECO, you specify the line # for new lines being added. Is it possible that the line # specified already exists for the BOM? Please check the BOM in Enter/Change BOM (P3002), but with an asterisk (*) in the effective or as-of date, so you see the ENTIRE BOM, including any lines that are no longer effective. If this is the case, change the line # in the ECO for the new BOM line, and you should be ok.
 
Don

Thank you for your reply. I tried to find the BOM but here is the results:
This is before the BOM is created - after the ECO is all approved - than the BOM is created.

I can see all the lines on P3013 but each one has the same error that I had mentioned.
 
Back
Top Bottom