Chris Quinn
Active Member
For E1, e910, Tools 9.1.2.3, WLS, Oracle 11g Standard 11.2.0.4 DB, all Win 2008 Server for Web, Enterprise and DB, fat client Win 7 we have the following results.
I have a batch process that runs in about one hour locally on a fat client in DV910. When I run the same batch process in JDV910 on the server (Win Server 2008 R2), the same batch process, it takes about 5 hours to complete. Basically, the job is reloading a table with about 190,000 records.
The fat client and enterprise servers are both VMWare VMs.
Has anyone experienced this disparity in processing times between a fat client and server; with Win Server 2008?
Thanks,
Chris Quinn
I have a batch process that runs in about one hour locally on a fat client in DV910. When I run the same batch process in JDV910 on the server (Win Server 2008 R2), the same batch process, it takes about 5 hours to complete. Basically, the job is reloading a table with about 190,000 records.
The fat client and enterprise servers are both VMWare VMs.
Has anyone experienced this disparity in processing times between a fat client and server; with Win Server 2008?
Thanks,
Chris Quinn