Checking in to see if someone can point me in the correct direction with this issue:
I am currently in the middle of the TR9.2 upgrade or our system from TR 9.1.5.5 to TR 9.2.0.3 (Application Release E9.1). I am following the required white papers and documents for the upgrade however I am stuck at a stage where when I launch the ASI to run against the DV910 environment and it reaches a stage where it shows which TC's will be run, it does not list any TC's. I was however successful in completing the ASI along with TC conversion for PS910. So there is something in DV910 which is causing this and if I could use some help that would be great.
I have already applied the required Planner ESU's and Tools Roll up ESUs to both DV910 and PS910 successfully.
I am attaching the screen shot where it shows the TC conversion window for DV910 and it's blank. Even when I click close and proceed with the ASI ofcourse it fails for the next steps.
For this upgrade, I had to perform a Deployment server migration to a new server because we wanted to be on the supported platform. Here are the platform details.
E9.1
TR 9.1.5.5
iSeries V7R1
Deployment Server: Windows 20102 R2
I am currently in the middle of the TR9.2 upgrade or our system from TR 9.1.5.5 to TR 9.2.0.3 (Application Release E9.1). I am following the required white papers and documents for the upgrade however I am stuck at a stage where when I launch the ASI to run against the DV910 environment and it reaches a stage where it shows which TC's will be run, it does not list any TC's. I was however successful in completing the ASI along with TC conversion for PS910. So there is something in DV910 which is causing this and if I could use some help that would be great.
I have already applied the required Planner ESU's and Tools Roll up ESUs to both DV910 and PS910 successfully.
I am attaching the screen shot where it shows the TC conversion window for DV910 and it's blank. Even when I click close and proceed with the ASI ofcourse it fails for the next steps.
For this upgrade, I had to perform a Deployment server migration to a new server because we wanted to be on the supported platform. Here are the platform details.
E9.1
TR 9.1.5.5
iSeries V7R1