Hi Lists,
Like to clarify what's the difference by giving item cost level (CLEV) = 3, the functions/results between cost methods 02 and 09 ? Or can we say 02 is suggested CLEV = 2 and 09 is suggested when CLEV = 3 under manufacturing actual costing ?
Thanks any feedbacks !
Regards,
John
E1 9.0 Tools 9.1.0.4
Like to clarify what's the difference by giving item cost level (CLEV) = 3, the functions/results between cost methods 02 and 09 ? Or can we say 02 is suggested CLEV = 2 and 09 is suggested when CLEV = 3 under manufacturing actual costing ?