Work Center Successful messages

LuCas AI

Member
Hello there,
I have a question regarding automatic Work Center messages: “OneWorld Job R5648034 Complete” for JDE Xe.

The scenario is:
The report R6060008 calls the report R5648034, using the API jdeLaunchUBEEX.
In this case, the R5648034 finished without error, therefore no message is posted to the work center, but when the report finishes and returns the control to R6060008 a message is inserted in the WC table F01131 (the location will be the following line to the jdeLaunchUBEEX call, within the R6060008 ).


I have attached:
- the logic that uses the R5648034 for the Work Center point of view
- the log that was produced between the time when the R5648034 returned the control to the R6060008 and the debug moved from “jdeLaunchUBEEX” to the next line “{”.

Does anybody know if there is some kind of setup that sends these“successful” messages to the work center?

Any help in this matter?

Regards,
Lucas
 

Attachments

  • 155041-WC Successful Files.zip
    4 KB · Views: 87
Back
Top