E9.2 R03B16A - memory allocation error

tkim415

Active Member
We had someone messing around and putting the wrong century (21 in CTRY field) in the date pattern (P03B08). after fixing the date pattern, we tried to run R03B16A with Thru date blank, number of days for summary to zero. after running for a day, the job had the memory allocation error.

is there a way to run the job with date range so that we don't have to face the memory allocation error?
 
Back
Top