Hi,
The reaon for not populating A1 cost si go to the BOM and
1) against the ingedients check the date range which you have defined. If the date ranges you defined and it doenst fall in the date on which you are running the program the the material cost will not be populated.
2) In the BOm against the ingredients check the cost % if it is zero then also the material cost will not be populated.
Hence make the above two things in sink. I hope this shouls solve your problem.
Thanks
Rajesh Gupta
rcodlin <
[email protected]> wrote:
Ok. Things I would check:
Make sure the process item is actually stocking type 'R'
Make sure the co/by products stocking type is a manufactured code.
What is the resource percentage for the co/by products, is it correct?
Yield on the routing step that the co/by products are produced?
Are the co/by products produced by any other process and if so, has the co/by products planning table been populated properly?
What you're describing is a bit unusual. The normal reason for A1 costs not appearing is from either incorrect data selection or incorrect processing options on the cost rollup program. But this would cause issues with both the cost of the process and the end products.