ravins2006 Member Feb 28, 2006 #1 Would like to know as to how the work center's down time getting adjusted with the shopfloor calendar.So that the planning module schedule the mfg activity considering the WC availability
Would like to know as to how the work center's down time getting adjusted with the shopfloor calendar.So that the planning module schedule the mfg activity considering the WC availability