agrothberg
Member
Is there a JDE module in 9.2 that supports finite production scheduling with constraints? I found this PDF for 8.12 (module then was called 'EnterpriseOne Supply Chain Planning Production Scheduling') that looks to have all the features I would want, but the page I found about this feature is this pretty skimpy: https://www.oracle.com/us/sitemaps/production-scheduling-065812.html.