Original Promised OPDJ

IRBYD

Active Member
Does anybody know of a reason why the Original Promise Date OPDJ in not on the sales order detail grid? Before I change something there must have been a reason.
 
From what I know it gets populated with the value from DRQJ. Since DRQJ can be changed as and when needed based on availability and so on. OPDJ sticks with the initial value that way giving the visibility(for reporting puposes to check delivery performance and so on) on what was originally promised when the order was entered.
 
OPDJ isn't always equal to DRQJ (Date requested), it depends wether you have TMS (transportation) active or not and also wether you have set up routes with transit and/or preparation days.
I would say OPDJ = PPDJ the first time you enter the order.
But JDE doesn't use this field from my experience, if you need to populate it manualy it shouldn't be a problem for the standards.

Fred
 
Back
Top