pfaloney
Well Known Member
We are adding a new location (Company Level) that wants to do costing at the Lot/Level. All other locations are either Standard Cost or Weighted average.
I am use to one costing method company wide (usually Standard Cost).
The plant will be using Item Numbers that are common across multiple locations (Different companies) which means site(s) could have Standard (Method 7) or Weighted Average (2) while this location would be Lot/Level (Method 6 maybe 9).
Is this even possible? We are currently on 9.0 and going to 9.2 later this year.
I am use to one costing method company wide (usually Standard Cost).
The plant will be using Item Numbers that are common across multiple locations (Different companies) which means site(s) could have Standard (Method 7) or Weighted Average (2) while this location would be Lot/Level (Method 6 maybe 9).
Is this even possible? We are currently on 9.0 and going to 9.2 later this year.