multilevel BOM Costing

SasiKumar

Member
Hi group,
My client's scenario is like this: We are using standard costing (07) method. Client have multi level BOM with manufactured items as sub-assemblies. Both the parent and the manufactured sub-assemblies have got procured raw material and outside operations. ie., both the parent and the sub-assemblies are having A1 and D1 costs.

When I run the cost roll-up for the parent item, A1 for the child is not picked-up. But D1 for the child and parent are picked at the parent level item cost.
If I remove the Outside operation for the child subassembly, A1 is picked-up for the parent and child at the parent level cost.

Kindly suggest what could be reason for this peculiar behaviour. You may also mail to my personal id: [email protected].

Thanks,
B. Sathish Kumar
 
Search the Knowledge Garden for SARs on B3000640. There are several possible corrected issues that culd have caused the problem you are seeing.

Suggest you download and apply the latest ESU containing this object.

Regards,
 
Back
Top