HampMcCool
Active Member
I have a UBE that runs fine locally, but, fails on the server with "pointer out of range".
We've built a full package, deployed to both client and server, re-synchronised the data dictionaries, checked the OCM, and the problem still happens.
Our enterprise server is an AS/400 with ERP 8 SP22.
This could have something to do with the fact that the run environment for a UBE on the AS/400 is a little different than it is on a client PC, but I can't seem to isolate what might be causing it.
I'm open to all ideas!
Thanks to all that help!
We've built a full package, deployed to both client and server, re-synchronised the data dictionaries, checked the OCM, and the problem still happens.
Our enterprise server is an AS/400 with ERP 8 SP22.
This could have something to do with the fact that the run environment for a UBE on the AS/400 is a little different than it is on a client PC, but I can't seem to isolate what might be causing it.
I'm open to all ideas!
Thanks to all that help!