Quality Management

hsiao_te_wang

Well Known Member
Hi Lists,
Does someone have the clear explaination for Sample Percetage, Accept Quantity and Accept Percetage in P3701 ?
I have look around the on-line help but confused why Accept Quantity/Percetage have to be blank once the Sample Percetage equals to 100. I am assuming 100% of the lot has to be tested but not 100% has to be passed.
I think I may misunderatand the points. Would someone have the advice ? Thanks !
John
OW Xe, SP13
 
John,

My guess is that you wouldn't want to knowingly include defective items in a passed lot. If you're 100% inspecting, I would think you would want to disposition the defective items; since the entire quantity is one lot, you would need to fail the lot until the defective items were scrapped or reworked.