hsiao_te_wang
Well Known Member
Hi Lists,
Does someone have the clear explaination for Sample Percetage, Accept Quantity and Accept Percetage in P3701 ?
I have look around the on-line help but confused why Accept Quantity/Percetage have to be blank once the Sample Percetage equals to 100. I am assuming 100% of the lot has to be tested but not 100% has to be passed.
I think I may misunderatand the points. Would someone have the advice ? Thanks !
John
OW Xe, SP13
Does someone have the clear explaination for Sample Percetage, Accept Quantity and Accept Percetage in P3701 ?
I have look around the on-line help but confused why Accept Quantity/Percetage have to be blank once the Sample Percetage equals to 100. I am assuming 100% of the lot has to be tested but not 100% has to be passed.
I think I may misunderatand the points. Would someone have the advice ? Thanks !
John
OW Xe, SP13