msouterblight1
VIP Member
Hello all,
I am currently planning an upgrade from 8.9 to 8.12. I will be using 2 deployment servers, the existing server will remain on 8.9, the new server will be used for 8.12. While looking through the upgrade guide, I see that I need to configure the Planner - B9 datasource to point to the Planner database on the 8.9 server. My question is, what actually gets pulled from the old planner DB to the new planner DB. From the upgrade guide, there is a screen shere you specify where the relaease master, locations, OCM, environments, etc. are pulled from, and these should all point to the previous SYSTEM datasource. So, if all the relevant info is being pulled from the system tables, why do I need to connect to the previous planner?
Thanks,
I am currently planning an upgrade from 8.9 to 8.12. I will be using 2 deployment servers, the existing server will remain on 8.9, the new server will be used for 8.12. While looking through the upgrade guide, I see that I need to configure the Planner - B9 datasource to point to the Planner database on the 8.9 server. My question is, what actually gets pulled from the old planner DB to the new planner DB. From the upgrade guide, there is a screen shere you specify where the relaease master, locations, OCM, environments, etc. are pulled from, and these should all point to the previous SYSTEM datasource. So, if all the relevant info is being pulled from the system tables, why do I need to connect to the previous planner?
Thanks,