subhashreeg12
Member
Hi, We have an item for which the MRP messages are not trigerred when R3483 is run. The below check were done.
1. item BP setup seems to be fine (planning code/fence days)
2. The data selection and PO of R3483 is matched
3. We do have demand for the same
4. Calendar setup exists
Let me know if something is missing still.
Thanks.
1. item BP setup seems to be fine (planning code/fence days)
2. The data selection and PO of R3483 is matched
3. We do have demand for the same
4. Calendar setup exists
Let me know if something is missing still.
Thanks.