[FONT="]Hi everyone,[/FONT]
[FONT="] [/FONT]
[FONT="]Version: JDE Enterprise One[/FONT]
[FONT="] [/FONT]
[FONT="]I am looking into rolling out JDE Leadtime Rollup Program that is found within the Plant Manufacturing Data program (https://docs.oracle.com/cd/E26228_01/doc.93/e21780/appendix_a.htm#WEASP554). Specifically I am looking to calculate Level Lead Time which is shown as using the formula/inputs as seen below (also linked).[/FONT]
[FONT="] [/FONT]
[FONT="]I pulled all of these variables out and tried to manually recreate what the Leadtime Rollup program calculated but my values aren't even close to what the program calculates. I am confident I have recreated the formula as seen below correctly so I believe this may be a problem of using the wrong inputs.[/FONT]
[FONT="] [/FONT]
[FONT="]My question is does anyone know which tables/where each of these variables are being pulled from? For example for the Time Basis Code, does it pull from the Routing Master (F3003) or Branch Master?[/FONT]
[FONT="] [/FONT]
[FONT="] [/FONT]
[FONT="][/FONT]
[FONT="] [/FONT]
[FONT="]Thanks in advance![/FONT]
[FONT="] [/FONT]
[FONT="]Version: JDE Enterprise One[/FONT]
[FONT="] [/FONT]
[FONT="]I am looking into rolling out JDE Leadtime Rollup Program that is found within the Plant Manufacturing Data program (https://docs.oracle.com/cd/E26228_01/doc.93/e21780/appendix_a.htm#WEASP554). Specifically I am looking to calculate Level Lead Time which is shown as using the formula/inputs as seen below (also linked).[/FONT]
[FONT="] [/FONT]
[FONT="]I pulled all of these variables out and tried to manually recreate what the Leadtime Rollup program calculated but my values aren't even close to what the program calculates. I am confident I have recreated the formula as seen below correctly so I believe this may be a problem of using the wrong inputs.[/FONT]
[FONT="] [/FONT]
[FONT="]My question is does anyone know which tables/where each of these variables are being pulled from? For example for the Time Basis Code, does it pull from the Routing Master (F3003) or Branch Master?[/FONT]
[FONT="] [/FONT]
SUM | Sum of all operations |
M or L | Either machine or labor hours based on the prime load code |
E or M | Number of employees or machines in the work center |
EF or UT | Efficiency or Utilization from the work center |
Cum Yield % | From the Routing Master (F3003) |
MLQ | Manufacturing lead time quantity |
TIMB | Time basis |
Setup | Setup time from the Routing Master (F3003) |
Total Queue & Move | Queue plus Move time from routing master or work center |
[FONT="][/FONT]
[FONT="] [/FONT]
[FONT="]Thanks in advance![/FONT]