porup
Active Member
Hello List,
Probably a "OneWorld admin for dummies" question but here goes..
Can any step me thru how I can copy Business Data - PROD to Business Data - CRP using the UDB DB2 v7.2 Control Centre tool (or another alternative)?
R98403 takes too long and I'm looking for a backdoor solution to do a data refresh.
I've been thrown into the deep end and I'm not sure if a backup-restore (or redirected restore?) will do the job.. not being a UDB admin guru. I'm concern a restore will also restore the PD table space names and I'm not 100% if these can be changed to reflect CRP instead.
Thanks for the tips,
/Philip
OW Xe, ES W2K, DB2 UDB v7.2 on Intel
(ignore my 'old' sig)
[blink]
Probably a "OneWorld admin for dummies" question but here goes..
Can any step me thru how I can copy Business Data - PROD to Business Data - CRP using the UDB DB2 v7.2 Control Centre tool (or another alternative)?
R98403 takes too long and I'm looking for a backdoor solution to do a data refresh.
I've been thrown into the deep end and I'm not sure if a backup-restore (or redirected restore?) will do the job.. not being a UDB admin guru. I'm concern a restore will also restore the PD table space names and I'm not 100% if these can be changed to reflect CRP instead.
Thanks for the tips,
/Philip
OW Xe, ES W2K, DB2 UDB v7.2 on Intel
(ignore my 'old' sig)
[blink]