FrankCLT
Well Known Member
Hello All,
If I have a worktable that has multiple POs with varying lines that will need to update the F4301\F4311 files, do I need to do the (XT4311Z1), BeginDoc, EditLIne, EditDoc EditLine and EndDoc for each record being read from my worktable?
Thanks as always,
FrankCLT
If I have a worktable that has multiple POs with varying lines that will need to update the F4301\F4311 files, do I need to do the (XT4311Z1), BeginDoc, EditLIne, EditDoc EditLine and EndDoc for each record being read from my worktable?
Thanks as always,
FrankCLT