Vzhukov
Member
R3482 Top To Bottom MRP Processing takes 2 hours, which is too long. Are there examples of faster processing? What processing time could be a benchmark.
We are using ERP8 verson (B7334), have about 6 levels in the BOM, and about 4000 items in total.
Our Enterprise Server parameters: 2xCPU Pentium4 Xeon 3GHz, 2Gb RAM, RAID5 SCSI Ultra320, Win2k Server, MS SQL 2000 Server.
We are using ERP8 verson (B7334), have about 6 levels in the BOM, and about 4000 items in total.
Our Enterprise Server parameters: 2xCPU Pentium4 Xeon 3GHz, 2Gb RAM, RAID5 SCSI Ultra320, Win2k Server, MS SQL 2000 Server.