Future Cost Update Program R41052

moath

Member
14- If I assigned the following cost methods to an item at a specific branch,
02 : 200 USD
05 : 500USD
07 : 700USD
08 :800USD
If I ran Future Cost Update Program R41052 and I chose the following data selection criteria:
Item 2nd Number
Branch Number
Cost Method is equal to the following list of values (05, 07, 08)
Then I specified cost method no 2 to be updated with a future cost
How does the program update cost method no 2?
 
Back
Top