Can anyone give an advice on setup of the Inclusion rule R in the Configurator?

Thanks in advance
 
We create a Master Route (attached to a non configured item) and then set the rules to include individual operations for this route and use the derived calculation to adjust the times.

The master route has to be set that the times of individual operations are in relation to any factor that can be calculated by the configurator.
 
So, what you are saying is that in addition to the configured parent item - another item would need to be set up to be able to attache the routings? What stocking type would you use? We are attempting to implement the configurator - and currently use Master Routings, but we want minimal work orders to be generated. We are using Q rules - with the majority of the assemlies inside set up as phantoms, and only 2 modules with routings, thus keeping the number of work orders needed to build a configured item to 3.
 
Well, we use M Stocking type, but this items are using for nothing else than to store the master routes.

This makes easy to mantain the routes of the configurator. and to revise all the route of a process. our configured items can use up to 4 levels and 11 configured childs.
 