marinescu
Active Member
Subject: Work with CPV (Common Procurement Vocabulary) using JD Edwards Category Codes
Hello,
Request: The customer wants to work using an annual procurement plan.
It is mandatory that he uses CPV (Common Procurement Vocabulary) codes when entering OQ, OR, OB or OP order types. That will help tracking and can be used for report purposes.
Resolution: Change DD size (DTAS) of PRP1 (Commodity Class) and PRP2 (Commodity Subclass) from 3 to 10, the data type will remain as a string. I actually need the size of 8, but just to be covered.
Changes on DD will be made through OMW, as part of a project.
Is it mandatory to make the same changes to PDP1 (Reporting code 1-Purchasing) and PDP2 (Reporting code 1-Purchasing)?
The codes from the CPV are to be attached to Item Master and Item Branch/Plant through Category Codes.
Add new records in 41/P1 (let’s say 12345678-9) and 41/P2 (let’s say 98765432-1).
I would be grateful for an opinion from your side if this is the correct/easiest way to do and changes must be done to all 4 DD items above or only to PRP1 and PRP2.
Configuration: JD Edwards EnterpriseOne 9.1, TR 9.0.1.
Thank you.
Hello,
Request: The customer wants to work using an annual procurement plan.
It is mandatory that he uses CPV (Common Procurement Vocabulary) codes when entering OQ, OR, OB or OP order types. That will help tracking and can be used for report purposes.
Resolution: Change DD size (DTAS) of PRP1 (Commodity Class) and PRP2 (Commodity Subclass) from 3 to 10, the data type will remain as a string. I actually need the size of 8, but just to be covered.
Changes on DD will be made through OMW, as part of a project.
Is it mandatory to make the same changes to PDP1 (Reporting code 1-Purchasing) and PDP2 (Reporting code 1-Purchasing)?
The codes from the CPV are to be attached to Item Master and Item Branch/Plant through Category Codes.
Add new records in 41/P1 (let’s say 12345678-9) and 41/P2 (let’s say 98765432-1).
I would be grateful for an opinion from your side if this is the correct/easiest way to do and changes must be done to all 4 DD items above or only to PRP1 and PRP2.
Configuration: JD Edwards EnterpriseOne 9.1, TR 9.0.1.
Thank you.