daveschultz
Well Known Member
We are trying to not allow our users to change a status of a work order, once it gets to a certain status. So when a work order gets to the complete status, they should not be able to change the status there. We thought that this worked by setting the Lock Flag to 4 (this is how our users swear it worked in the past). This is still allowing people to change the status and Oracle has said that is how it is supposed to work. I think I may be able to do this through row security, but wondering how others are doing it.
Thanks
Dave
E1 9.0.2
Tools 9.1.0.4
Thanks
Dave
E1 9.0.2
Tools 9.1.0.4