ommsai.n
Member
Hi ,
If anyone have experience to achieve shipment consolidation in JDE 9.1
1. With Same Order
2. 2 Branch Plant .
I need to know
1.if there is modification need to be done from Technical side ( which BSFN /Objects?)
2. Is there any Set up need to be done from Functional side.
Thanks
If anyone have experience to achieve shipment consolidation in JDE 9.1
1. With Same Order
2. 2 Branch Plant .
I need to know
1.if there is modification need to be done from Technical side ( which BSFN /Objects?)
2. Is there any Set up need to be done from Functional side.
Thanks