moath
Member
Hi List.
If I have Product X which is defined in Branch 1 with a cost of 5 $ and I want to transfer this item to another Branch 2 and assign it with cost of 6.5$
Product X is not defined in Branch 2.
I can do this by using the Transfer Program, which will in turn define this product in branch 2.
Any way, I can not change the cost field in branch Y when I work with the transfer form.
Are there any way of changing the cost in the receiving branch other than changing the cost after the transfer process is completed
If I have Product X which is defined in Branch 1 with a cost of 5 $ and I want to transfer this item to another Branch 2 and assign it with cost of 6.5$
Product X is not defined in Branch 2.
I can do this by using the Transfer Program, which will in turn define this product in branch 2.
Any way, I can not change the cost field in branch Y when I work with the transfer form.
Are there any way of changing the cost in the receiving branch other than changing the cost after the transfer process is completed