E9.2 R46171 - a mixed batch of Putaways and Replenishments

JohnDanter2

JohnDanter2

VIP Member
Hi folks

If I have a process creating Putaways and Replenishments at the same time (depends on logic to control TYFL) is it ok to use the same run of R46171 to pick them both up in one batch?
Or do I need to 2 batches and 2 seperate subsystem calls to move them from F4600 to F4611?
Most versions of R46171 have TYFL as a data selectio so I think that's my answer, no. I need 2 subsystems calls for seperate versions but maybe one batch is fine

Thanks

John
 
Back
Top