E9.1 Material Shortage by Work Order

Elvis344

Member
Hi everyone,

So in my previous job I had very nice raport named Material Shortage by Work Order. I was able to download it for branch plant and add infomration like for what WO status I want raport and for what period of time. I had there information about:
W.O. Number
W.O. Status
W.O. Type
W.O. Item
Legacy W.O. Item
Master Planning Family
Parent Planner Number
Component/RI Item
Legacy Component Item
Component/RI Item Description
WO Start Date
Requested Date
Requested Branch
Component Quantity Required
UM
Quantity On Hand
Quantity Short
Total Qty on PO
Component Planner Number
Buyer Code
CPT Flg
Supplier
1st PO Number
Open PO Qty
PO Promise Date
Reference

Now I changed my job and I was wondering if this is some kind of default report which I can find in system. I was trying to look for it but still not success. Maybe the problem is that i don't have access to some roles.
Maybe someone of You is familiar with this report and could help me? If this help I can attach example how exactly this report looks like. I am using version 9.1.5

Thanks
Jan
 