richchipper
Well Known Member
I consider myself fairly intelligent, but I'm stumped on how the LTCV is being calculated. I cannot get the formula in the Interactive Calculation Sheet from Oracle document Doc ID 881632.1 to tie to the number the system is calculating. It's not even close. The calculated number is 1.23.
Using the downloadable calculator, here is the formula:
Here is the router from F3003:
Here is the Work Center Information:
The shift hours are the same for both. What in the world am I missing? Even if I change the Time Basis code to B, it's still not right.
Using the downloadable calculator, here is the formula:
Here is the router from F3003:
Here is the Work Center Information:
The shift hours are the same for both. What in the world am I missing? Even if I change the Time Basis code to B, it's still not right.